Consumer Information

Consumer Guidance

Procedures

  • Procedure for Domestic/Commercial Service Connection
  • Procedure for Agricultural Service Connection
  • Procedure for LT Industrial Service Connection
  • Procedure for HT Service Connection
  • Dos and Don'ts for Getting Service Connection

Information & Tools

  • Load Calculator
  • Electricity Tax for HT Consumers
  • Security Deposit Guidelines
  • Cable Fault Locating Charges
  • Consumer Grievance Procedure

Citizen Charter

The Citizen Charter sets the service standards and quality benchmarks for TANGEDCO's electricity services across Tamil Nadu.

Service Connection Time Schedule

ConditionTime Limit
No extension or improvement work requiredGenerally within a week, not exceeding 30 days
Extension/improvement without distribution transformers60 days
Extension/improvement with distribution transformers90 days

HT / EHT Service Connection Time Schedule

Work TypeHTEHT
Extension and improvement work60 days150 days
Enhancing or adding a power transformer120 days180 days
Commissioning a new substation180 days270 days

Interruption and Restoration Times

CauseCorporationUrban MunicipalityRuralHill Area
HT supply failure1 hr3 hrs6 hrs12 hrs
Fault in transformer, LT line or pillar box2 hrs4 hrs6 hrs12 hrs
Fault of distribution transformer24 hrs48 hrs48 hrs48 hrs
Individual service connection fault3 hrs9 hrs12 hrs24 hrs

Other Service Standards

ServiceTime Limit
Shifting of meter or service25 days
Shifting of LT/HT lines60 days
Shifting of transformer structure90 days
Transfer of service connection7 days
Tariff change7 days
Meter replacement30 days

Complaints Resolution Procedure

  • Lodge a complaint by phone, in person or by letter at the section or sub-division office
  • Escalate to the Executive Engineer or Superintending Engineer if unresolved
  • Monthly grievance day held per division by the Superintending Engineer
  • Each distribution circle has a Public Relations Officer
  • Consumer Grievance Redressal Forums operate in each distribution circle
  • Power failure call centres at Chennai, Coimbatore, Madurai, Trichy and Erode — dial 1912

How You Can Help Us Serve You Better

  • Pay your bills early to avoid queues
  • Protect the meter from damage
  • Report stuck, burnt or damaged meters promptly
  • Conserve electricity — do not waste energy
  • Cooperate with inspections
  • Renew worn wiring for safety
  • Help by cutting trees and bushes near power lines
  • Do not overload the meter with unauthorized loads
  • Do not let unqualified persons tamper with electrical equipment

Other Consumer Resources

Schemes & Programs

  • PM Solar House Free Electricity Scheme
  • Aadhaar Linking for Service Connections
  • Agricultural Service Connections
  • 350 Nos Agri SPL Priority Scheme
  • Tamil Nadu State Energy Calculator

Outage Information

  • Scheduled Outage Information
  • Outage Details in SIPCOT Area
  • Circle-wise Present Fuse-off Call Status
  • Circle-wise Previous Day Call Status

⚡ Energy / Electricity Saved is Energy Produced  |  Save energy for benefit of self and nation ⚡